Call Us on 020 8050 9695 to book a Site Visit / to discuss The Potentiality Of Your HOME EXPANSION

A build over agreement in HA3 post code.

The existing manhole within the extension footprint will be relocated outside the new building line, with a new access chamber positioned along the sewer flow to ensure continued inspection and maintenance.

A precast concrete lintel with 150mm bearing will bridge the sewer pipe to prevent direct loading, while trench foundations on either side provide stability and a 150mm pea shingle surround protects the pipe and supports drainage.

Address: 31 Goodmayes Road, Essex, IG3 9UH

Email: info@xlinearchitecture.co.uk

Phone: 020 8050 9695

Mobile: 079 4609 6932

Registered in England No. 12481695